ADNOC OFFSHORE - EPC AGREEMENT FOR UPPER ZAKUM 1.0 MMBD SUSTAIN PHASE 1 – SURFACE FACILITIES PROJECT

September 14, 2026

ADNOC OFFSHORE - EPC AGREEMENT FOR UPPER ZAKUM 1.0 MMBD SUSTAIN PHASE 1 – SURFACE FACILITIES PROJECT

Target Engineering Construction Co LLC, UAE
SCOPE OF WORK

6" to 24" Alloy 825 Clad Pipes, Clad Fittings and Alloy 625 Clad Flanges

All Projects

Project Background:

The Upper Zakum 1.0 MMBD Sustain Phase 1 – Surface Facilities Project is a strategic initiative led by ADNOC Offshore to enhance and maintain oil production capacity at one of the largest offshore oil fields in the world. The project aims to sustain the field’s output at 1 million barrels per day (MMBD) through major upgrades to its surface facilities and supporting infrastructure.

Proclad was awarded a critical role in this development, supplying corrosion-resistant alloy (CRA) cladded pipes, fittings, and flanges, along with full prefabrication, inspection, and testing services. The materials were specifically engineered to withstand the harsh operating conditions associated with offshore oil production, including high pressure, temperature, and corrosive service.

This project highlights Proclad’s ability to deliver high-spec engineered solutions for large-scale offshore energy developments and underlines our commitment to supporting the long-term operational goals of UAE’s national oil company.

Heading
Heading
Heading
Heading

Entre em contato

Ligue para nós
+971 (0)4 870 4100
Endereço
National Industries Park, Dubai, P.O.BOX 123776, EAU
Ligue para nós
+44 (0)1592 772568
Endereço
Viewfield Road, Viewfield Industrial Estate, Glenrothes, Fife, KY6 2RD Escócia, Reino Unido

Entre em contato

Morada
National Industries Park, Dubai, P.O.BOX 123776, E.A.U.
Morada
Viewfield Road, Viewfield Industrial Estate, Glenrothes, Fife, KY6 2RD Escócia, Reino Unido